X1 Standard rigging lifting procedures
This document is a non-comprehensive visual guide that contains images, text, and video with HOLOPLOT’s X1 rigging system in motion.
This document is an overview of the rigging operation procedures for discussion or presentation purposes.
This document does not contain sufficient information in order to safely or successfully operate HOLOPLOT’s X1 Rigging system.
DO NOT operate HOLOPLOT X1 rigging without fully reading and comprehending the HOLOPLOT X1 Rigging Manual.
Email support@holoplot.com if you need the HOLOPLOT X1 Rigging Manual
Parts naming convention
X1 Liftbar
X1 Lift plate Left
X1 Lift plate Right
X1 Side plate Left
X1 Side plate Right
MD96
Module locking features
Main lever
Lever release
Side lever
Side connector
Hook bar
1. Attachment
Step 1
Press down on the lever release
Step 2
Lift the main lever upward
Step 3
Insert X1 lift plates onto the top of side plates (into hookbar slots)
Step 4
Push the main lever downward
2. Mechanism detail
3. Connection modules
Step 1
Open the lid of the Dolly Cases
Bring the side Dolly Bumper-Flaps down
Step 2
Lift up on the side lever
Step 3
Push the Audio Modules together
Step 4
Press down the side lever
Wheel boards or flight cases can be used to replace the dollies during installation. The wheel board can not be wider than 80 cm max, and need to be able to take a load of up to 190 kg.
All wheel boards need to have exactly the same height so modules can be interconnected horizontally.
After placing the module (with rigging attached) on a wheelboard with the sideplates hanging over left & right follow step 3-5 from previous page.
4. Hole details
5. Attachment of lift bars
Step 1
Insert lift bar into lift plate rails
Step 2
Remove the lift bar QRPs from their storage position
Step 3
Insert them into the hole number you want to use
Step 4
Verify that the QRPs have been inserted into the same hole number on both lift plates (left and right)
6. Attachment of 2nd lift bar
Step 1
Insert lift bar into lift plate rails
Step 2
Remove the lift bar QRPs from their storage position
Step 3
Insert them into hole number you want to use and insert the pin also in neighboring lift bar
Step 4
Verify that the QRPs have been inserted into the same hole number on both lift plates (left and right)
7. Lifting up upper modules
Step 1
Check lift bar secure connection
Step 2
Insert shackle and secure the connection to the lift bar
Step 3
Make sure the dolly locks are first opened
Step 4
Lift the array up
8. Vertical connection
Step 1
Open all four main levers of the connecting modules
Step 2
Slowly bring the flown array down and guide the feet of the bottom module
Step 3
Close all four main levers to secure the two groups of modules together
Step 4
Make sure the dolly locks are first opened, then lift the array up
Lift the array
Last updated