# X1 Standard rigging lifting procedures

{% hint style="danger" %}
This document is a non-comprehensive visual guide that contains images, text, and video with HOLOPLOT’s X1 rigging system in motion.&#x20;

This document is an overview of the rigging operation procedures for discussion or presentation purposes.

This document does not contain sufficient information in order to safely or successfully operate HOLOPLOT’s X1 Rigging system.
{% endhint %}

{% hint style="danger" %}
DO NOT operate HOLOPLOT X1 rigging without fully reading and comprehending the HOLOPLOT X1 Rigging Manual.

Email <support@holoplot.com> if you need the HOLOPLOT X1 Rigging Manual
{% endhint %}

<figure><img src="/files/V0o6pLHNAZWAPGmer8We" alt=""><figcaption></figcaption></figure>

## Parts naming convention

<figure><img src="/files/qIpDEsiD3r20CFrzNtXl" alt=""><figcaption></figcaption></figure>

1. X1 Liftbar
2. X1 Lift plate Left
3. X1 Lift plate Right
4. X1 Side plate Left
5. X1 Side plate Right
6. MD96

## Module locking features

<figure><img src="/files/112YbRpymyM5il3PpUOd" alt=""><figcaption></figcaption></figure>

1. Main lever
2. Lever release
3. Side lever
4. Side connector
5. Hook bar

### 1. Attachment

{% embed url="<https://www.youtube.com/watch?v=flOCkU5GShw>" %}

<figure><img src="/files/0mqm5IBXQZuOOm6YoUYT" alt=""><figcaption></figcaption></figure>

#### Step 1

Press down on the lever release

#### Step 2

Lift the main lever upward

#### Step 3

Insert X1 lift plates onto the top of side plates (into hookbar slots)

#### Step 4

Push the main lever downward

### 2. Mechanism detail

{% embed url="<https://www.youtube.com/watch?v=flOCkU5GShw>" %}

<figure><img src="/files/dWpD22SzfX0IM70JN4r2" alt=""><figcaption></figcaption></figure>

### 3. Connection modules

{% embed url="<https://www.youtube.com/watch?v=flOCkU5GShw>" %}

<figure><img src="/files/As4NboDmkkYWIq6NUSII" alt=""><figcaption></figcaption></figure>

#### Step 1

Open the lid of the Dolly Cases

Bring the side Dolly Bumper-Flaps down

Step 2

Lift up on the side lever

#### Step 3

Push the Audio Modules together

#### Step 4

Press down the side lever

Wheel boards or flight cases can be used to replace the dollies during installation. The wheel board can not be wider than 80 cm max, and need to be able to take a load of up to 190 kg.

All wheel boards need to have exactly the same height so modules can be interconnected horizontally.

After placing the module (with rigging attached) on a wheelboard with the sideplates hanging over left & right follow step 3-5 from previous page.

### 4. Hole details

{% embed url="<https://www.youtube.com/watch?v=flOCkU5GShw>" %}

<figure><img src="/files/3a92mx0q0s2rulQzN8dB" alt=""><figcaption></figcaption></figure>

### 5. Attachment of lift bars

{% embed url="<https://www.youtube.com/watch?v=flOCkU5GShw>" %}

<figure><img src="/files/0cqfaraP6W0WLESNIKC4" alt=""><figcaption></figcaption></figure>

#### Step 1

Insert lift bar into lift plate rails

#### Step 2

Remove the lift bar QRPs from their storage position

#### Step 3

Insert them into the hole number you want to use

#### Step 4

Verify that the QRPs have been inserted into the same hole number on both lift plates (left and right)

### 6. Attachment of 2nd lift bar

{% embed url="<https://www.youtube.com/watch?v=flOCkU5GShw>" %}

#### Step 1

Insert lift bar into lift plate rails

#### Step 2

Remove the lift bar QRPs from their storage position

#### Step 3

Insert them into hole number you want to use and insert the pin also in neighboring lift bar

#### Step 4

Verify that the QRPs have been inserted into the same hole number on both lift plates (left and right)

### 7. Lifting up upper modules

{% embed url="<https://www.youtube.com/watch?v=flOCkU5GShw>" %}

#### Step 1

Check lift bar secure connection

#### Step 2

Insert shackle and secure the connection to the lift bar

#### Step 3

Make sure the dolly locks are first opened

#### Step 4

Lift the array up

### 8. Vertical connection

{% embed url="<https://www.youtube.com/watch?v=flOCkU5GShw>" %}

<figure><img src="/files/goopJlygUKHTK4Gy6VTs" alt=""><figcaption></figcaption></figure>

#### Step 1

Open all four main levers of the connecting modules

#### Step 2

Slowly bring the flown array down and guide the feet of the bottom module

#### Step 3

Close all four main levers to secure the two groups of modules together

#### Step 4

Make sure the dolly locks are first opened, then lift the array up

Lift the array&#x20;


---

# Agent Instructions: Querying This Documentation

If you need additional information that is not directly available in this page, you can query the documentation dynamically by asking a question.

Perform an HTTP GET request on the current page URL with the `ask` query parameter:

```
GET https://docs.holoplot.com/user-guides/holoplot-system-deployment/rigging/x1-standard-rigging-lifting-procedures.md?ask=<question>
```

The question should be specific, self-contained, and written in natural language.
The response will contain a direct answer to the question and relevant excerpts and sources from the documentation.

Use this mechanism when the answer is not explicitly present in the current page, you need clarification or additional context, or you want to retrieve related documentation sections.