X1 Standard rigging lifting procedures

This document is a non-comprehensive visual guide that contains images, text, and video with HOLOPLOT’s X1 rigging system in motion.

This document is an overview of the rigging operation procedures for discussion or presentation purposes.

This document does not contain sufficient information in order to safely or successfully operate HOLOPLOT’s X1 Rigging system.

DO NOT operate HOLOPLOT X1 rigging without fully reading and comprehending the HOLOPLOT X1 Rigging Manual.

Email support@holoplot.com if you need the HOLOPLOT X1 Rigging Manual

Parts naming convention

  1. X1 Liftbar

  2. X1 Lift plate Left

  3. X1 Lift plate Right

  4. X1 Side plate Left

  5. X1 Side plate Right

  6. MD96

Module locking features

  1. Main lever

  2. Lever release

  3. Side lever

  4. Side connector

  5. Hook bar

1. Attachment

Step 1

Press down on the lever release

Step 2

Lift the main lever upward

Step 3

Insert X1 lift plates onto the top of side plates (into hookbar slots)

Step 4

Push the main lever downward

2. Mechanism detail

3. Connection modules

Step 1

Open the lid of the Dolly Cases

Bring the side Dolly Bumper-Flaps down

Step 2

Lift up on the side lever

Step 3

Push the Audio Modules together

Step 4

Press down the side lever

Wheel boards or flight cases can be used to replace the dollies during installation. The wheel board can not be wider than 80 cm max, and need to be able to take a load of up to 190 kg.

All wheel boards need to have exactly the same height so modules can be interconnected horizontally.

After placing the module (with rigging attached) on a wheelboard with the sideplates hanging over left & right follow step 3-5 from previous page.

4. Hole details

5. Attachment of lift bars

Step 1

Insert lift bar into lift plate rails

Step 2

Remove the lift bar QRPs from their storage position

Step 3

Insert them into the hole number you want to use

Step 4

Verify that the QRPs have been inserted into the same hole number on both lift plates (left and right)

6. Attachment of 2nd lift bar

Step 1

Insert lift bar into lift plate rails

Step 2

Remove the lift bar QRPs from their storage position

Step 3

Insert them into hole number you want to use and insert the pin also in neighboring lift bar

Step 4

Verify that the QRPs have been inserted into the same hole number on both lift plates (left and right)

7. Lifting up upper modules

Step 1

Check lift bar secure connection

Step 2

Insert shackle and secure the connection to the lift bar

Step 3

Make sure the dolly locks are first opened

Step 4

Lift the array up

8. Vertical connection

Step 1

Open all four main levers of the connecting modules

Step 2

Slowly bring the flown array down and guide the feet of the bottom module

Step 3

Close all four main levers to secure the two groups of modules together

Step 4

Make sure the dolly locks are first opened, then lift the array up

Lift the array