X1 Standard rigging lifting procedures
Last updated
Last updated
© 2024 HOLOPLOT GmbH. All rights reserved.
This document is a non-comprehensive visual guide that contains images, text, and video with HOLOPLOT’s X1 rigging system in motion.
This document is an overview of the rigging operation procedures for discussion or presentation purposes.
This document does not contain sufficient information in order to safely or successfully operate HOLOPLOT’s X1 Rigging system.
DO NOT operate HOLOPLOT X1 rigging without fully reading and comprehending the HOLOPLOT X1 Rigging Manual.
Email support@holoplot.com if you need the HOLOPLOT X1 Rigging Manual
X1 Liftbar
X1 Lift plate Left
X1 Lift plate Right
X1 Side plate Left
X1 Side plate Right
MD96
Main lever
Lever release
Side lever
Side connector
Hook bar
Press down on the lever release
Lift the main lever upward
Insert X1 lift plates onto the top of side plates (into hookbar slots)
Push the main lever downward
Open the lid of the Dolly Cases
Bring the side Dolly Bumper-Flaps down
Step 2
Lift up on the side lever
Push the Audio Modules together
Press down the side lever
Wheel boards or flight cases can be used to replace the dollies during installation. The wheel board can not be wider than 80 cm max, and need to be able to take a load of up to 190 kg.
All wheel boards need to have exactly the same height so modules can be interconnected horizontally.
After placing the module (with rigging attached) on a wheelboard with the sideplates hanging over left & right follow step 3-5 from previous page.
Insert lift bar into lift plate rails
Remove the lift bar QRPs from their storage position
Insert them into the hole number you want to use
Verify that the QRPs have been inserted into the same hole number on both lift plates (left and right)
Insert lift bar into lift plate rails
Remove the lift bar QRPs from their storage position
Insert them into hole number you want to use and insert the pin also in neighboring lift bar
Verify that the QRPs have been inserted into the same hole number on both lift plates (left and right)
Check lift bar secure connection
Insert shackle and secure the connection to the lift bar
Make sure the dolly locks are first opened
Lift the array up
Open all four main levers of the connecting modules
Slowly bring the flown array down and guide the feet of the bottom module
Close all four main levers to secure the two groups of modules together
Make sure the dolly locks are first opened, then lift the array up
Lift the array